The project is in the Vostochny port in the Russian Far East to receive coal transported by rail and transfer it to the port via a belt conveyor transport system to load large bulk cargo carriers. With a reliable transmission system, the port has a loading capacity of 3,000 tons per hour and a coal handling capacity of about 6 million tons.
The main technical parameters of conveyor are as follows :
Capacity : 3000t/h (maximum 3300t/h)
Bandwidth : 2200 mm
Tape speed : 4 m/s
Ambient temperature : -31℃~+36℃ (average +14℃)
Ambient humidity : 99% Max
Maximum wind speed : 40m/s
Annual precipitation : 813mm
Maximum snow load: 700Pa